Building a Commercial-Grade MK5 Equipment Pad

July 28, 20252 min read

1. What Is an MK5 Equipment Pad?

An MK5 equipment pad is a reinforced concrete slab engineered to support the weight and vibration of commercial equipment like HVAC units, backup generators, or heavy machinery. It must be precisely constructed for performance, longevity, and safety.

At Northform Concrete, we specialize in industrial and commercial pads across Ontario—including MK5 configurations that meet structural, municipal, and mechanical requirements.


2. Why It Matters for Your Operation

The right concrete pad prevents long-term equipment damage, preserves surrounding infrastructure, and keeps your site compliant with building codes and load requirements.

A poorly constructed pad can lead to:

  • Equipment misalignment

  • Foundation cracks

  • Vibration issues

  • Costly structural failures


3. Core Specifications of a MK5 Pad

Here’s what typically defines an MK5-rated concrete pad:

  • Pad Dimensions: Customized based on equipment footprint (e.g. 4' x 6' to 10' x 10'+)

  • Thickness: Minimum 6"–8" reinforced with rebar or mesh

  • Base Preparation: 6" compacted granular base to prevent settling

  • Reinforcement: #4 or #5 rebar grid at 12" spacing or engineered spec

  • Finish: Machine-troweled or broom finish depending on access & equipment base

  • Anchoring: Sleeves or J-bolts installed based on mechanical specs

  • Drainage Sloping: Ensures runoff without undermining pad stability


4. Step-by-Step: How We Build It Right

Step 1: Site Survey & Engineering Review
We inspect soil conditions, drainage, weight loads, and mechanical plans.

Step 2: Base Preparation
Excavation, grading, and compacted gravel base to ensure no movement post-pour.

Step 3: Formwork & Reinforcement
We build forms and install rebar per load specs and local code.

Step 4: Precision Pouring
High-strength concrete mix (typically 32 MPa or greater) poured and leveled.

Step 5: Finishing & Curing
Trowel finish or surface texture applied. Cure period begins to ensure strength.

Step 6: Compliance & Sign-Off
Final inspection for anchoring, alignment, and finish. Ready for equipment install.


5. Common Questions Answered

How long until equipment can be placed?
Typically 7 days for light equipment, 14–28 days for heavier loads.

Is a permit required?
Often yes—especially for large generator pads or mechanical installations.

Can Northform handle custom anchor points?
Yes—we coordinate with your trades or mechanical contractors for precision placement.


6. Why Choose Northform for Your MK5 Pad?

Engineered for Load-Bearing Durability
Compliance with Ontario Building Code & Industry Standards
Timely Scheduling for Equipment Coordination
Experienced in HVAC, Generator, and Industrial Equipment Bases
Warranty-Backed Commercial Work

Whether you're installing a new system or upgrading your infrastructure, we make sure your MK5 equipment pad is built with the future in mind.

Back to Blog

Follow Us

Follow Us

Southwestern Ontario's Partner for Exceptional Concrete Projects

Contact Us

  • (519) 323-6852

  • 5752 Longwoods Rd

  • Monday - Friday, 8:00 am - 5:00 pm

© Copyright 2025. NorthForm Concrete & Construction. All rights reserved.